In the making...
Water feature project 2004-6.
Click on an image for a larger picture.
Stream taking shape. I
had 32 bags of soil at one stage.
Emptied and lined to
save puncturing liner.
Filling with brick
rubble and old slates from local shed roof.
Turfing. This little
bird waited for worms under everything.
Alison took away all of
the turves for building up bottom of her garden, also
a lot of the soil.
Yours truly dismantling
the rockery.
Starting to build shape
and structure.
Did not use wire for
construction.
Removed wire and dustbin
reservoir as it would be too difficult to fit now
liner all in one piece.
Shaping walls.
Top-left: New rockery;
top: top pond; left: bog; right: back section
ericatious and front bog; bottom: bottom pond;
centre: waterfall and stream.
Old rockery dismantled.
Trees moved to the back. Replanted.
Stream taking shape.
Dustbin removed. Lower
pond reshaped.
Huge liner went over all
sections so should not be any leaks!
Hose from bottom pond
goes under rockery, comes out of top waterfall, now
revamped.
Stream liner going
in.
Managed to get local
Devon rocks.
New rockery on the
right.
Ken made this bridge in
Cornwall, dismantled and reassembled it here. Alan
helping with positioning.
Ken made this bridge in
Cornwall, dismantled and reassembled it here. Alan
helping with positioning.
Now in final position,
liner and underfelt had to be taken up to concrete
the eight legs.
Top corner ready for
gravel, all bags had to be washed and seived as they
are covered in white milky silt.
Section of stream.
Another deep water pond
along side of stream. The old curtain - cheaper than
hessian - dipped in wet cement made with red sand
takes on contours of sides of stream, roughed up
looks natural.
This pair of curtains
cost £1 in charity shop and with careful cutting has
done the whole 50 feet of stream.
Cement channel to
support top edge.
Moving on towards next
bridge.
Strengthening girders to
support concrete imitation railway sleepers to
support wheelchair.
Sleepers in place.
Half the garden
finished, summer 2005.
September 2005
Sleeper bridge over
entrance to garden
Going towards pond
reservior
Last section being
prepared
Liner goes up retaining
wall before wall blocks are attached
Centre section being
prepared